Featured

Underground Fleet Maintenance

Underground fleet maintanance

Atlas Corp Co.
Sandvik
AArd
GHH


Workshop Equipment


CNC Lathe
Milling Machine
Vertical Drill Machine
CNC Plasma/Gas Profile Cutter
Victor “V” Centre
RF Brand Saw
Slotting Machine
Pedestal Drill
Hydraulic Press and Power Pack
Welding & Cutting Equipment
Plate Bending
Plate Cutting Hydraulic Drive


Rebuilds


Drill Rigs
Atlas Corp Co.
Sandvik
AArd
GHH


Onsite Repairs


Picture4
Curved Ramps
Straight Ramps
Steelworks
Station Steelwork


Diaphragm Pumps

522 V Diaphram Pump
30 Meters Head Complete with Gearbox
1” and 2 “

 
 

Underground Projects

  • Shaft Repairs & Steel manufacturing.
  • Rail Installations.
  • Stoping; Drill, blast, Support, Construction.
  • Development Drill, Blast, Support , Construction.
  • Construction to ventilation water and air columns.
  • Concrete work to dams, battery bays , workshops etc.
  • Pump Installations and Supply.
  • Reclaim of Equipment.
  • Sweepings and ore recovery.
  • Secondary Support
  • Safety control.

 

 

Andile Qaku is the founder of Khaya Engineering having established a reputation for quality performance in the Mining and Construction industries. Khaya Engineering (Pty) Ltd has been in operation since 2005 in Randfontein South Africa. The company has vested interests in the Mining, Engineering, and Construction industries in which it has built a reputation for quality and professionalism.

Read more...

Operational reports

  • Receiving operator reports.
  • Monitor cost for each vehicle.
  • Monitor downtime on an individual and fleet basis. (Availability/Utilization)
  • Report on performance on monthly basis.
  • Perform regular equipment condition reports and make corrective recommendation.
  • Report on breakdowns and unscheduled repairs
  • Record all Lub- L/Ton.
  • Monitor driving practices.

Costs and controls

  • Cost control on spares/ Repairs Procedure Standardization of store systems.
  • Record keeping on tyres R/Ton.
  • Damage control investigations.

Maintenance

Once the planned maintenance schedules and times have been set down and approved no mining official shall overrule the responsible engineer.

Planned Maintenance = Daily, Weekly, Monthly, Quarterly, and yearly scheduled maintenance activities shall be drawn up per equipment type.

  • Planned Maintenance.
  • Planned Maintenance Schedule.
  • Missed Services.
  • Monthly Reports.
  • Standard for determine the efficiency.

 

36 Fiat Street, Aureus - Please Fill in Your Address for Directions

Address:
City:
State:
Zip: